Documents

Sign in

Documents list

Login here for member pricing.

Pub. No.Name / Description / Price / Order

CCA Complete Document Set

COMPLETE SET OF CCA DOCUMENTS

(1, 5, 17) and Guides (16, 25, 26, 27, 28, 29, 50, 81, 82, 1993)


Choose document version (before add to cart):

CCDC Complete Document Set

COMPLETE SET OF CCDC DOCUMENTS

(2, 3, 10, 11, 14, 15) and Guides(12, 20, 21, 22, 23, 24, 40, 43, 48)


Choose document version (before add to cart):

CCDC 2 - 2008

Stipulated Price Contract Between Owner and Contractor

Standard prime contract between Owner and prime Contractor to perform the required work for a single, pre-determined fixed price or lump sum, regardless of the Contractor's actual costs.


Choose document version (before add to cart):

CCDC 3 (1998)

Cost Plus Contract

Standard prime contract between Owner and prime Contractor to perform the required work on an actual-cost basis, plus a percentage or fixed fee which is applied to actual costs.


Choose document version (before add to cart):

CCDC 4 (2011)

Unit Price Contract

Standard prime contract between Owner and prime Contractor to perform the required work for a pre-determined, fixed amount for each specified unit of work performed. The total price is dtermined by multiplying the unit price by the actual, measured quanity of work performed for each specified unit.


Choose document version (before add to cart):

CCDC 5A - 2010

Construction Management Contract – For Services

Standard contract between Owner and Construction Manager for which the Work is to be performed by Trade Contractors. The Construction Manager acts as a limited agent of the Owner providing advisory services and administering and overseeing the contracts between the Owner and Trade Contractors.

* Available in electronic format only.


Choose document version (before add to cart):

CCDC 9A (2001)

Statutory Declaration of Progress Payment Distribution by Contractor

A sworn statement for use by the Contractor as a condition of receiving payment for either the second and subsequent applications for progress payment or the release of holdback funds.

NOTE: This is a free download but an Authorized Seal is needed to make this an official recognized document.

Download CCDC 9A (2001) file here (PDF)


Choose document version (before add to cart):

CCDC 5B - 2010

Construction Management Contract – For Services and Construction

Standard contract between Owner and Construction Manager to provide advisory services during the pre-construction phase and perform the required Work during the construction phase. At the outset, the Work is performed on an actual-cost basis, plus a percentage or fixed fee which is applied to actual costs. The parties may agree to exercise the following options: Guaranteed Maximum Price (GMP), GMP Plus Percentage Cost Savings, and conversion into a Stipulated Price Contract.

* Available in electronic format only.


Choose document version (before add to cart):

CCDC 9B (2001)

Statutory Declaration of Progress Payment Distribution by Subcontractor

A sworn statement for use by the Subcontractor as a condition of receiving payment for either the second and subsequent applications for progress payment or the release of holdback funds.

NOTE: This is a free download but an Authorized Seal is needed to make this an official recognized document.

Download CCDC 9B (2001) file here (PDF)


Choose document version (before add to cart):

CCDC 11 - 1996 (R2006)

Contractor's Qualification Statement

A standard form for obtaining information on capacity, skill and experience of Contractors bidding on building construction projects.


Choose document version (before add to cart):

CCDC 12 - (1994)

1994 Project Financial Information

A model form to assist the Owner in showing that financial arrangements have been made to fulfill the Owner's obligations under the contract (e.g. CCDC 2).


Choose document version (before add to cart):

DOCUMENT 14 - (2000)

Design-Build Stipulated Price Contract (CCA, CSC, RAIC)

Standard prime contract between Owner and Design-Builder where the Design-Builder performs Design Services and Construction under one agreement, for a single, pre-determined stipulated or fixed price.


Choose document version (before add to cart):

DOCUMENT 15 - (2000)

Design-Builder/Consultant Contract (CCA, CSC, RAIC)

Standard contract between Design-Builder and Consultant to perform the design services required under a design-build contract between Owner and Design-Builder.


Choose document version (before add to cart):

CCDC 17 - 2010

Stipulated Price Contract for Trade Contractors on Construction Management Projects

Standard contract form between Owner and Trade Contractor to perform the Work for a single, pre-determined fixed price, regardless of the Trade Contractor's actual costs. It is specifically for use where the project is performed under the CCDC 5A Construction Management method of contracting.

* Available in electronic format only.


Choose document version (before add to cart):

CCDC 18 - (2001)

Civil Works Contract

Standard prime contract between Owner and Contractor for civil works construction, e.g. roads, bridges, dams, underground utilities, etc.


Choose document version (before add to cart):

CCDC 20 - (2008)

Guide to the Use of CCDC 2 - 2008

A guide document designed to assist users of CCDC 2


Choose document version (before add to cart):

CCDC 21 - (2000)

A Guide to Construction Insurance

A guide document explaining construction insurance policies and requirements in CCDC contract forms.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCDC 22 - (2002)

A Guide to Construction Surety Bonds

A guide document explaining the surety bonding process and the purpose and function of the CCDC standard bond forms (i.e. CCDC 220, 221 and 222).

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCDC 23 - (2005)

A Guide to Calling Bids and Awarding Construction Contracts

A guide document outlining the process of soliciting and evaluating construction bids, and awarding the construction contract. Includes a sample bid form.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCDC 24 - (1996)

A Guide to Model Forms and Support Documents

A guide document to assist users of CCDC 2 - 1994 in meeting the administrative requirements outlined in that standard contract form. For each model form the guide contains a brief explanation of each of the administrative processes involved, a short narrative description to guide users of the form, a list of items which should be included in the form, and an example of a model form.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCDC 40 - (2005)

Rules for Mediation and Arbitration of Construction Disputes

Standard rules for mediation and arbitration of CCDC 2 construction disputes to be used in conjunction with the dispute resolution procedures of CCDC 2.


Choose document version (before add to cart):

CCDC 43 1998

Guide to the Use of CCDC 3 - 1998

A guide document designed to assist users of CCDC 3 - 1998


Choose document version (before add to cart):

CCDC 48 - (2002)

A Guide to the Use of CCDC 18-2002

A guide document designed to assist users of CCDC 18 - 2001 Civil Works Contract.


Choose document version (before add to cart):

CCDC 220 (2002)

Bid Bond

Standard surety bid bond form guaranteeing the bidder's intention to enter into a formal contract and to provide the specified contract security if the bid is accepted.


Choose document version (before add to cart):

CCDC 221 (2002)

Performance Bond

Standard surety performance bond form guaranteeing performance of the contract by the Contractor.


Choose document version (before add to cart):

CCDC 222 (2002)

Labour & Material Payment Bond

Standard surety labour and material payment bond form guaranteeing that the Contractor will satisfy all labour and material payment obligations incurred in performing the contract.


Choose document version (before add to cart):

CCA 1 (2008)

Stipulated Price Contract

Standard subcontract form between prime contractor and subcontractor where payment is based on a stipulated or fixed price. Users can choose between the refer-by-reference or stand-alone approaches simply by completing either page 2A or 2B (not both) and discarding the other page.


Choose document version (before add to cart):

CCA 16 - (1992)

Guidelines for determining the costs associated with performing changes in the work

A guide document outlining a change-order checklist and including a model change-order quotation form.


Choose document version (before add to cart):

CCA 19 - 2011

Stipulated Price Sub-subcontract

Standard sub-subcontract form between subcontractor and sub-subcontractor where payment is based on a stipulated or fixed price.

Users can choose between the refer-by-reference or standalone approaches simply by completing either page 2 or 3 (not both) and discarding the other page.


Choose document version (before add to cart):

CCA 25 - (2001)

A guide to project management services

A guide document outlining the project management concept and describing the project manager's role and standard of performance in managing a project from conception through design to construction and commissioning.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCA 26 - (2000)

A guide to construction management contracts

A guide document describing the construction management method of contracting. It explains the recommended roles and qualifications for a construction manager as well as providing guidelines for the selection process and fee schedule.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCA 27 (1997)

A guide on construction environmental management planning

A guide document outlining sound environmental practices in the construction industry. It serves to assist contractors in developing an Environmental Management Program.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCA 28 - (2009)

A guide to improving cash flow in the construction industry

A guide document identifying where cash flow problems generally occur in a construction project and suggests possible solutions.

NOTE: This Document is PST exempt.


Choose document version (before add to cart):

CCA 50 - (2003)

A prime contractor’s guide to project financing and payment security

CCA 50 offers detailed guidance to prime contractors on understanding their client's financial strength and how they are financing your project. This guide shows how a prime contractor can minimize the risk of non-payment prior to bidding on a project, prior to signing a contract, and during the administration of a contract. A financing risk management checklist is also provided to list questions that a prime contractor should ask during the bidding and contracting stages, and types of security available to minimize the risk of non-payment.


Choose document version (before add to cart):

CCA 51 - 2008

Guide to calling bids & awarding contracts

A guide document recommending best practices in all aspects of the bid calling and award subcontract process.

** Document Available in both Hardcopy and Electronic Format


Choose document version (before add to cart):

CCA 52 - 2008

Joint venture guide

A guide documents that introduces the concept of a joint venture involved in commercial construction, outlines the potential advantages and risks inherent, identifies keys to a success joint venture, and provides a checklist of commercial consideration of a joint venture agreement.

** Document Available in both Hardcopy and Electronic Format


Choose document version (before add to cart):

CCA 61 - 2008

Risks of pre-purchasing equipment and materials for construction projects

A guide document that explains the costs and risks associated with pre-purchasing equipment and materials, which may outweigh any anticipated economic and scheduling advantage.

** Document Available in both Hardcopy and Electronic Format


Choose document version (before add to cart):

CCA 81 - (2001)

A best practices guide to solid waste reduction

A guide document providing an overview of federal, provincial and municipal waste guidelines and the CCA's Waste Management Code of Practice.


Choose document version (before add to cart):

CCA 82 - (2004)

Mould guidelines for the Canadian construction industry

A guide document offering practical advice on mould-related issues (legal, insurance, and health considerations). It also offers helpful information on how to minimize its presence, identify and measure it, and step-by-step instructions on remediation.


Choose document version (before add to cart):

CCA 83 - 2004

Environmental best practices guide for hot mix asphalt plants


Choose document version (before add to cart):

CCA 90 - 2007

Guidelines for electronic procurement


Choose document version (before add to cart):

Guide - 2011

A TRADE CONTRACTOR'S GUIDE AND CHECKLIST TO CONSTRUCTION CONTRACTS

A guide document outlining certain contractual provisions which can adversely affect the trade contractor's rights and obligations. It includes a checklist for trade contractors.

** Document Available in both Hardcopy and Electronic Format


Choose document version (before add to cart):

Guide - 1993

Recommended guidelines for provision of geotechnical information in construction contracts

A guide document jointly developed with the Association of Consulting Engineers of Canada to assist Owners, Consultants and Contractors in overcoming problems associated with geotechnical information provided in construction contracts.


Choose document version (before add to cart):

CCA HR Tool Kit

CCA Human Resource Toolkit

A Guide to Leadership in the Construction Industry is designed to provide employers in the construction industry with practical guidance on human resources related issues.

This Toolkit includes explanations of key concepts, templates, and case studies. It contains modules on ‘workforce planning’, ‘recruitment and selection’, ‘workforce engagement and performance’, and a ‘prescription for leading in changing times’.

** Document Available in Hardcopy Format only


Choose document version (before add to cart):